Risk and Reliability Assessment

Related virtual library items - Related experience

Background

Pipelines must provide a safe method of transporting energy, and pipeline operators must ensure that the public, the environment and property are protected from any associated risks.

Pipelines are safe because they are designed to recognised and proven design codes, and they are continually maintained and inspected during service. Operators are aware of the risks that a pipeline poses to the surrounding public and environment and take steps to ensure that the risk is kept to the lowest level that is reasonably practicable. This 'risk management' during service is usually focussed on preventing damage to the pipeline, and deterioration due to corrosion.

Risk assessment methodologies have been used extensively in other industries for a number of years (e.g. process, and nuclear), but it is only recently that are they being applied to pipelines. With the issuing of the Pipelines Safety Regulations by the HSE, the application of risk assessment methods to pipelines has increased dramatically.

A risk assessment can be used for a wide variety of applications, but the basic methodology is the same irrespective of the industry or the application.

A risk assessment may be either qualitative or quantitative. In some cases qualitative assessments may be sufficient, for example if it can be shown that the failure frequency will not increase as a result of a design infringement; in other cases a quantitative analysis will be required.

Benefits

Applying risk based methodologies which allow risks to be measured and compared can provide considerable benefits, such as:

The key benefit is that risk assessment allows decisions to be made and resources to be allocated within a transparent, logical and consistent framework.

Diagram showing how risk varies with time, inspection and repair

Applications and Experience

Penspen Integrity have considerable experience in using risk assessments, and applying risk methodologies. Some of the major applications include: